Construction & lifting
24V DC power pack for a construction lift
The problem
A lift manufacturer needed a compact 24V unit with controlled lowering and reliable low-temperature operation. [placeholder case]
The solution
Custom power pack with compensated lowering valve, oversized reservoir and dedicated contactor; sample delivered in 3 weeks. [placeholder case]
3
weeks to sample
24V
DC supply
100%
units tested
Application photo